Short Lead Time for T6 Series Double Pump to Maldives Importers
Short Lead Time for T6 Series Double Pump to Maldives Importers Detail:
High pressure and high performance dowel pin type vane pumps widely used for plastic machinery, casting machinery, metallurgy machinery, pressing machinery, refining machinery, construction machinery, marine-machinery.
Features
1. With dowel pin vane structure, it can work in high pressure, low noise and long lifetime
2. This vane pump can fit wide viscosity hydraulic medium, and be started at low temperature and worked at high temperature.
3. As the vane pump adopts bilabial vane, it has high oil pollution resistance and wide speed scope.
NO. | Part | Qty | NO. | Part | Qty | NO. | Part | Qty |
1 | Shaft | 1 | 6 | Cir Clip For Shaft | 2 | 11 | Middle Body | 1 |
2 | Straight Key | 1 | 7 | Ball Bearing | 1 | 12 | Rear Cartridge | 1 |
3 | Hexagon Head Bolt | 4 | 8 | Cir Clip For Hole | 1 | 13 | Rectangle Seal Ring | 1 |
4 | Front Cover | 1 | 9 | Rectangle Seal Ring | 1 | 14 | Rear Cover | 1 |
5 | Shaft Seal | 1 | 10 | Front Cartridge | 1 | 15 | Hexagon Head Bolt | 4 |
Model Designation
T6CC | S | W | -025 | -17 | -1 | R | 02 | -C | 1 | 10 |
Series | Type Code |
Vice Type Code |
Flow-shaft end Pump |
Flow-cover end pump | Shaft type |
Rotation | Port positions |
Design number |
Sealing Level |
Port dimensions |
T7BB | NO: USE ISO 3019 Installation Flange S: USE SAE C J744 installation flange |
NO | B02、B03、B04、B05、B06、B07、B08、B10、B12、B15 | B02、B03、B04、B05、B06、B07、B08、B10、B12、B15 | See size of shaft | (Views from shaft end of pump) R-right hand for clockwise L-left hand for counter-clockwise |
see picture below | C | 1-S1 NBR Nitrile rubber 5-S5, Fluororubber |
00、01, See installation dimensions |
T7DB | B14、B17、B20、B22、B24、B28、B31、B35、B38、B42 | B02、B03、B04、B05、B06、B07、B08、B10、B12、B15 | 00、01, M1 See installation dimensions | |||||||
T7DD | B14、B17、B20、B22、B24、B28、B31、B35、B38、B42 | B14、B17、B20、B22、B24、B28、B31、B35、B38、B42 | – | |||||||
T7EB | 042、045、050、052、054、057、062、066、072、085 | B02、B03、B04、B05、B06、B07、B08、B10、B12、B15 | ||||||||
T7ED | 042、045、050、052、054、057、062、066、072、085 | B14、B17、B20、B22、B24、B28、B31、B35、B38、B42 | ||||||||
T7EE | 042、045、050、052、054、057、062、066、072、085 | 042、045、050、052、054、057、062、066、072、085 | ||||||||
T67CB | NO: industrial type M: truck type P: truck type double seal kits S: truck type, SAE SAE C J744 installation flange |
W: Heavy str keyed shaft | 003/B03、005/B05、006/B06、008/B08、010/B10、012/B12、014/B14、017/B17、020/B20、022/B22、025/B25、028/B28、031/B31 | B02、B03、B04、B05、B06、B07、B08、B10、B12、B15 | ||||||
T6CC | 003/B03、005/B05、006/B06、008/B08、010/B10、012/B12、014/B14、017/B17、020/B20、022/B22、025/B25、028/B28、031/B31 | 003/B03、005/B05、006/B06、008/B08、010/B10、012/B12、014/B14、017/B17、020/B20、022/B22、025/B25、028/B28、031/B31 | 00、01, 10、11, See installation dimensions | |||||||
T67DB | 014/B14、017/B17、020/B20、024/B24、028/B28、031/B31、035/B35、038/B38、042/B42、045/B45、050/B50、061 | B02、B03、B04、B05、B06、B07、B08、B10、B12、B15 | – | |||||||
T67DC | B14、B17、B20、B22、B24、B28、B31、B35、B38、B42 | 003/B03、005/B05、006/B06、008/B08、010/B10、012/B12、014/B14、017/B17、020/B20、022/B22、025/B25、028/B28、031/B31 | 00、01, M1 See installation dimensions | |||||||
T6DC | 014、017、020、024、028、031、035、038、042、045、050、061 | 003/B03、005/B05、006/B06、008/B08、010/B10、012/B12、014/B14、017/B17、020/B20、022/B22、025/B25、028/B28、031/B31 | – | |||||||
T67EB | 042、045、050、052、057、062、066、072、085 | B02、B03、B04、B05、B06、B07、B08、B10、B12、B15 | ||||||||
T6EC | 042、045、050、052、057、062、066、072、085 | 003/B03、005/B05、006/B06、008/B08、010/B10、012/B12、014/B14、017/B17、020/B20、022/B22、025/B25、028/B28、031/B31 | ||||||||
T67EC | 042、045、050、052、057、062、066、072、085 | 003/B03、005/B05、006/B06、008/B08、010/B10、012/B12、014/B14、017/B17、020/B20、022/B22、025/B25、028/B28、031/B31 | ||||||||
T6ED | 042、045、050、052、057、062、066、072、085 | 014/B14、017/B17、020/B20、024/B24、028/B28、031/B31、035/B35、038/B38、042/B42、045/B45、050/B50、061 | ||||||||
T6EE | 042、045、050、052、057、062、066、072、085 | 042、045、050、052、057、062、066、072、085 |
Product detail pictures:
Related Product Guide:
Why every website owner needs Google Analytics
We always think and practice corresponding to the change of circumstance, and grow up. We aim at the achievement of a richer mind and body and the living for Short Lead Time for T6 Series Double Pump to Maldives Importers, The product will supply to all over the world, such as: Guinea, Lithuania, US, With a fully integrated operation system, our company has won a good fame for our high quality goods, reasonable prices and good services. Meanwhile, we have established a strict quality management system conducted in material incoming, processing and delivery. Abiding by the principle of "Credit first and customer supremacy", we sincerely welcome clients from home and abroad to cooperate with us and advance together to create a brilliant future.
By Irma from Cannes - 2017.09.28 18:29
The customer service reprersentative explained very detailed, service attitude is very good, reply is very timely and comprehensive, a happy communication! We hope to have a opportunity to cooperate.
By Kevin Ellyson from Guatemala - 2017.08.21 14:13