Rapid Delivery for 3525V Series Vane Pump to United Arab Emirates Factory
Rapid Delivery for 3525V Series Vane Pump to United Arab Emirates Factory Detail:
High Performance Intra vane Pumps for plastic injection machinery, Tool machinery, Die casting machinery and Metallurgy equipment.
Features
1.Intra vane pumps with hydraulic balancing structure provide more stable performance and longer life since less pressure from vane on stator.
2.Twelve vane system provide low amplitude flow pulsation resulting in low system noise characteristics.
3.Various displacement and shaft with 4 different outlet opposite position
4.The cartridge is independent of the drive shaft, allowing for easy servicing without remove the pump from its mounting.
Model Designation
| (F3-) | 3525V | 38 | A | 17 | -1 | AB | 22 | R |
| Note | Series | ▼ Flow-Shaft end pump | Port connection |
▼ Flow-cover end pump |
Shaft type | Outlet Position |
Design number |
Rotation |
| No-marking: Petroleum series oil emulsification fluid water glycol-fluid F3: phosphate ester fluid |
2520V | 10、12、14、15、17、 19、21、25 |
A-SAE A-SAE 4-bolt flange |
2、3、4、5、6、7、8、9、10、11、12、14 | 1-Str key 86-HD Str key 11-Spline |
See below | 22 | (Views from shaft end of pump) R-right hand for clockwise L-left hand for counter-clockwise |
| 3520V | 21、25、30、32、35、 38、45 |
2、3、4、5、6、7、8、9、10、11、12、14 | ||||||
| 3525V | 21、25、30、32、35、 38、45 |
10、12、14、15、17、19、21、25 | ||||||
| 4520V | 42、45、50、57、60、 66、75 |
2、3、4、5、6、7、8、9、10、11、12、14 | ||||||
| 4525V | 42、45、50、57、60、 66、75 |
10、12、14、15、17、19、21、25 | ||||||
| 4535V | 42、45、50、57、60、 66、75 |
21、25、30、32、35、38、45 |
Installation Dimensions
| Model | ∅a x full thread depth, 4 holes | ∅b x full thread depth, 4 holes | ∅b x full thread depth, 4 holes | |||||||||
| 2520V | 1/2-13UNC-2Bx23.8 | 3/8-16UNC-2Bx19.1 | 3/8-16UNC-2Bx19.1 | |||||||||
| 3520V | 5/8-11UNC-2B-30.0 | 7/16-14UNC-2BX22.3 | 3/8-16UNC-2Bx19.1 | |||||||||
| 3525V | 5/8-11UNC-2B-30.0 | 7/16-14UNC-2BX22.3 | 3/8-16UNC-2Bx19.1 | |||||||||
| 4520V | 5/8-11UNC-2B-30.0 | 1/2-13UNC-2Bx23.8 | 3/8-16UNC-2Bx19.1 | |||||||||
| 4525V | 5/8-11UNC-2B-30.0 | 1/2-13UNC-2Bx23.8 | 3/8-16UNC-2Bx19.1 | |||||||||
<
| Model | A | B | C | ∅D | E | ∅F | G | H | J | ∅K | ∅L | M |
| 2520V | 50.8 | 26.2 | 12.7 | 25.4 | 52.4 | 101.60/101.55 | 9.53 | 63.5 | 88.9 | 19.1 | 14.2 | 76.2 |
| 3520V | 62 | 30.1 | 15.9 | 31.7 | 58.7 | 127.00/126.95 | 9.53 | 76.2 | 106.3 | 19.1 | 17.5 | 76.2 |
| 3525V | 62 | 30.1 | 15.9 | 31.7 | 58.7 | 127.00/126.95 | 9.53 | 76.2 | 106.3 | 25.4 | 17.5 | 74.7 |
| 4520V | 69.9 | 35.7 | 15.9 | 38.1 | 69.9 | 127.00/126.95 | 12.7 | 88.9 | 120.6 | 19.1 | 17.5 | 76.2 |
| 4525V | 69.9 | 35.7 | 15.9 | 38.1 | 69.9 | 127.00/126.95 | 12.7 | 88.9 | 120.6 | 25.4 | 17.5 | 74.7 |
| Model | N | P | Q | R | S | T | ∅U | ∅V | RW | ∅X | Y | Z |
| 2520V | 88.1 | 101.6 | 38.1 | 76.2 | 76.2 | 250 | 250 | 85.3 | 14 | 174.7 | 22.2 | 47.6 |
| 3520V | 99.6 | 114.3 | 38.1 | 82.6 | 82.6 | 273.3 | 273.3 | 88.9 | 16 | 213 | 22.2 | 47.6 |
| 3525V | 109.5 | 114.3 | 38.1 | 82.6 | 82.6 | 287.3 | 287.3 | 88.9 | 16 | 213 | 26.2 | 52.4 |
| 4520V | 120 | 119.4 | 42.9 | 93.7 | 93.7 | 303.5 | 303.5 | 102.4 | 16 | 213 | 22.2 | 47.6 |
| 4525V | 136 | 119.4 | 42.9 | 93.7 | 93.7 | 325 | 325 | 102.4 | 16 | 213 | 26.2 | 52.4 |
Product detail pictures:





Related Product Guide:
Why every website owner needs Google Analytics
We've been committed to offering easy,time-saving and money-saving one-stop purchasing support of consumer for Rapid Delivery for 3525V Series Vane Pump to United Arab Emirates Factory, The product will supply to all over the world, such as: Jamaica, Detroit, Turkmenistan, Our company always provides good quality and reasonable price for our customers. In our efforts, we already have many shops in Guangzhou and our products have won praise from customers worldwide. Our mission has always been simple: To delight our customers with best quality hair products and deliver on time. Welcome new and old customers to contact us for the future long term business relationships.
This manufacturers not only respected our choice and requirements, but also gave us a lot of good suggestions, ultimately, we successfully completed the procurement tasks.





