Manufactur standard Vicks Servo Drive Taiwan Delta for Irish Factory
Manufactur standard Vicks Servo Drive Taiwan Delta for Irish Factory Detail:
Vicks Servo System Delta Drive

Technical Data
| 460V | Frame | C | D | E0 | E3 | E2 | |||||||||
| Model Number VFD-___VL43_-J | 055A | 075A | 110A | 150B | 185B | 220A | 300B | 370B | 450B | 550A | 750A | ||||
| Power (kW) | 5.5 | 7.5 | 11 | 15 | 18.5 | 22 | 30 | 37 | 45 | 55 | 75 | ||||
| Horsepower (HP) | 7.5 | 10 | 15 | 20 | 25 | 30 | 40 | 50 | 60 | 75 | 100 | ||||
| Output | Max. Current (A) (continuous 60 seconds ) | 21 | 27 | 36 | 46 | 58 | 62 | 102 | 124 | 155 | 187 | 255 | |||
| Max. Current (A) (continuous 20 seconds ) | 25 | 32 | 42 | 54 | 68 | 78 | 120 | 146 | 182 | 220 | 300 | ||||
| Input Current (A) | 14 | 18 | 24 | 31 | 39 | 47 | 56 | 67 | 87 | 101 | 122 | ||||
| Power | Input Voltage Tolerance | 3-Phase 380~480V, 50/60 Hz | |||||||||||||
| Mains Voltage Tolerance | ±10% (342-528V) | ||||||||||||||
| Mains Frequency Tolerance | ±5% (47-63Hz) | ||||||||||||||
| Weight (kg) | 8 | 10 | 10 | 10 | 10 | 13 | 13 | 28 | 36 | 50 | 50 | ||||
| General Specifications | Control Method | SVPWM | |||||||||||||
| Speed Detector | Resolver | ||||||||||||||
| Speed Input Command | DC 0~10V, support 3-point adjustment for analog inputs | ||||||||||||||
| Pressure Input Command | DC 0~10V, support 3-point adjustment for analog inputs | ||||||||||||||
| Pressure Feedback Command | DC 0~10V | ||||||||||||||
| General Input Signal | 5 ch DC24V 8mA | ||||||||||||||
| General Output Signal | 2 ch DC24V 50mA, 1 ch Relay output | ||||||||||||||
| Analog Output Voltage | 1 ch dc 0~10V | ||||||||||||||
| Optional Accessories | Speed Feedback PGA Card | Necessary (EMVJ-PG01R) | |||||||||||||
| Brake Resistor | Necessary (refer to appendix A) | ||||||||||||||
| Pressure Sensor | Necessray, only pressure sensors with output signal 0~10V can be used ( max. pressure value can be set by Pr. 00~08) | ||||||||||||||
| EMI Filter | Optional ( refer to Appendix A) | ||||||||||||||
| Protections | Motor Protection | Electronic thremal relay protection | |||||||||||||
| Over-current | 300% of rated current | ||||||||||||||
| Ground leakage current | Higher than 50% rated current | ||||||||||||||
| Voltage Protection | Over-voltage Level: Vdc>400/800V; Low-voltage Level: Vdc<200/400V | ||||||||||||||
| Mains Input Over-Voltage | Varistor (MOV) | ||||||||||||||
| Over-temperature | Built-in Temperature Sensor | ||||||||||||||
| Environment | Protection Level | NEMA 1/IP20 | |||||||||||||
| Operation Temperature | -10℃~45℃ | ||||||||||||||
| Storage Temperature | -20℃~60℃ | ||||||||||||||
| Humidity | 90% RH (non-condensing) | ||||||||||||||
| Vibration | 1.0G 20Hz, 20~60Hz 0.6G <20Hz: 1.0G, 20 to 60 Hz: 0.6G | ||||||||||||||
| Cooling System | (RUN, STOP) Force cooling (RUN, STOP) | ||||||||||||||
| Installation Location | Altitude 1,000m or lower (keep away from corrosive gasses, liquid and dust) | ||||||||||||||
| Certifications | CE | ||||||||||||||
Note: Bulit in brake chopper for models 22kw and below
Product detail pictures:

Related Product Guide:
Why every website owner needs Google Analytics
To constantly improve the management system by virtue of the rule of "sincerely, good faith and quality are the base of enterprise development", we widely absorb the essence of related products internationally, and constantly develop new products to meet the demands of customers for Manufactur standard Vicks Servo Drive Taiwan Delta for Irish Factory, The product will supply to all over the world, such as: Casablanca , Colombia , Surabaya , Our well-equipped facilities and excellent quality control throughout all stages of production enable us to guarantee total customer satisfaction. If you are interested in any of our products or would like to discuss a custom order, please feel free to contact me. We are looking forward to forming successful business relationship with new clients around the world.
This manufacturers not only respected our choice and requirements, but also gave us a lot of good suggestions, ultimately, we successfully completed the procurement tasks.



